Non Dry Dock Stormwater Monitoring for Puget Sound Naval Shipyard & IMF

Reports and Data Deliverables

Page Last Updated 3/10/2018

OLYMPUS DIGITAL CAMERA

 

Final Report

Brandenberger, J.M., D. Metallo, B. Rupert, R.K. Johnston, C. Gebhart, and J. Strivens, 2018. Non-Dry Dock Stormwater Monitoring Report for Puget Sound Naval Shipyard, Bremerton, WA 2010-2013. Final Report, Pacific Northwest National Laboratory PNNL-27900. Prepared by US Department of Energy under Contract DE-AC05-76RL01830.
NDDSW_PhaseI-III_2010-13_Final.pdf

Raw Data

NDDSW_DataSummary_052313.xlsx

2013 Storm Reports

2013_SW13_2012_12_16_EventReportv1.pdf (3.8 MB)

2013_SW14_2013_01_08_EventReportv1-1.pdf (6.4 MB)

2013_SW15_2013_02_22_EventReportv1-2.pdf (4.0 MB)

2013_SW16_2013_03_19_EventRpt_v1.pdf (4.6 MB)

 

2012 Annual Report

Brandenberger, J.M., D. Metallo, B. Rupert, R.K. Johnston, and C. Gebhart, 2012b. Phase II Annual Report: 2011-2012 Storm Season Sampling for Non-Dry Dock Stormwater Monitoring For Puget Sound Naval Shipyard, Bremerton, WA. Prepared for PSNS Project ENVVEST, by Pacific Northwest National Laboratory, December 2012. 73pp + Appendices.

2012__NDDSW_Annual_Report_2012_12_12.pdf 3.2 MB

2012_Append_A-SW08-12_Storm_Rpts.pdf (20.1 MB)

2012_Append_B_Chemistry_Rpts.pdf (13.0 MB)

2012_Append_C _Loading_Rpts.pdf (180 kB)

2012_Append_D_LISST.pdf (259 kB)

2011 Annual Report

Brandenberger, J.M., D. Metallo, B. Rupert, R.K. Johnston, and C. Gebhart, 2012a. Annual Report: 2010-2011 Storm Season Sampling for Non-Dry Dock Stormwater Monitoring For Puget Sound Naval Shipyard, Bremerton, WA. Prepared for PSNS Project ENVVEST, by Pacific Northwest National Laboratory, September 2012, Final Report. 72pp + Appendices.

2011__NDDSW_Annual_Rpt.pdf (1.5 MB)

2011_Append_A_SW01-07_Rpt.pdf (15.6 MB)

2011_Append_B_chemistry.pdf (11.3 MB)

2011_Appendix_C_Loading_Table.pdf (229 kB)

2011_Appendix_C_Loading_Table.xls (152 kB)

 

Project Work Plans and Field Sampling Information

PROJECT WORK PLAN for Non-Dry Dock Stormwater Monitoring Conducted at Puget Sound Naval Shipyard Bremerton, WA Project ENVVEST Study Area

2012-2013 Project Work Plan Addendum 2012-13_NDDSW_PWPA_FINAL.pdf

2011-2012 Project Work Plan Update 2011-2012_NDDSW_PWP_022312.pdf

2011 Project Work Plan FINAL_PSNS_NDDSW_PWP_011411_V1.pdf